Index / MCP servers / Change Order

Change Order MCP server

Connect Change Order and your agent gets 11 tools, among them change_order_add_line, change_order_create, change_order_delete. It answers at https://mcp.zovo.one/mcp/change-order over streamable HTTP, and it listed its tools to an anonymous client, so no sign-in was needed for that. Our probes reached it 6 of 6 times since 11 September 2026; the last check, on 24 October 2026, succeeded.

Status
Answering
Tools
11
Reliability
6 of 6 checks
Response time
472 ms
Transport
streamable HTTP
Last checked
24 October 2026

Change orders against a quote or work order: deltas, approval, running contract value.

Description as the publisher wrote it.

The 11 tools Change Order offers

ToolWhat it does
change_order_add_lineAdd one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.
Inputs: change_order, kind, description, quantity, unit_price_minor, was_quantity
change_order_createRaise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.
Inputs: reference, reference_kind, client, title, date, currency
change_order_deleteDelete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.
Inputs: change_order
change_order_documentRender one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download li
Inputs: change_order
change_order_getReturn one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.
Inputs: change_order
change_order_invoice_payloadBuild the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.
Inputs: change_order, issue_date, tax_rate
change_order_listList change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.
Inputs: reference, status, client, from, to, limit
change_order_statusMove one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.
Inputs: change_order, status, date, note
contract_valueThe running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.
Inputs: reference
license_activateTurn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.
Inputs: key
license_statusReport this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.

Add Change Order to your AI client

Every block below points at https://mcp.zovo.one/mcp/change-order. Pick your client and copy.

Claude Code: one command in your terminal
claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-order
Claude Desktop: claude_desktop_config.json
{
  "mcpServers": {
    "change-order": {
      "command": "npx",
      "args": ["-y", "mcp-remote", "https://mcp.zovo.one/mcp/change-order"]
    }
  }
}
Cursor: ~/.cursor/mcp.json, or .cursor/mcp.json in a project
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
VS Code and GitHub Copilot: .vscode/mcp.json
{
  "servers": {
    "change-order": {
      "type": "http",
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Zed: Zed settings.json
{
  "context_servers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Windsurf: ~/.codeium/mcp_config.json
{
  "mcpServers": {
    "change-order": {
      "serverUrl": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
JetBrains AI Assistant: Settings, Tools, AI Assistant, MCP, New MCP Server, as JSON
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Continue: .continue/mcpServers/neuronto.yaml
name: Change Order
version: 0.0.1
schema: v1
mcpServers:
  - name: Change Order
    type: streamable-http
    url: https://mcp.zovo.one/mcp/change-order
Gemini CLI: ~/.gemini/settings.json
{
  "mcpServers": {
    "change-order": {
      "httpUrl": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Codex CLI: MCP server config
{
  "mcpServers": {
    "change-order": {
      "type": "http",
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Warp: MCP servers, + Add, paste JSON
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
Goose: a one-click extension link
goose://extension?url=https%3A%2F%2Fmcp.zovo.one%2Fmcp%2Fchange-order&type=streamable_http&id=change-order&name=Change%20Order

Is Change Order up right now?

It answered our last check on 24 October 2026 in 472 ms. Over 6 checks since 11 September 2026 it answered 6. Status here comes from Neuronto's own probes, not from the publisher.

MCP servers similar to Change Order

Questions about Change Order

How many tools does Change Order have?

11, as returned by the server's own tools/list on 21 September 2026: change_order_add_line, change_order_create, change_order_delete, change_order_document, change_order_get, change_order_invoice_payload, change_order_list, change_order_status, and 3 more.

Is Change Order down?

It answered our last check on 24 October 2026 in 472 ms. Over 6 checks since 11 September 2026 it answered 6.

How do I add Change Order to Cursor?

Put the server under mcpServers in ~/.cursor/mcp.json with the URL https://mcp.zovo.one/mcp/change-order. The exact JSON is above, with the same setup for Claude Code, Claude Desktop, VS Code, Windsurf, Zed, Gemini CLI and the rest.

Does Change Order need an API key?

It listed its tools to an anonymous client, so reading the tool list needs no key. Individual tools can still ask for credentials in their own inputs.

Where this comes from

Publisher: io.github.theluckystrike. Endpoint host: mcp.zovo.one. ARD identifier: urn:air:io.github.theluckystrike:mcp:change-order. First indexed 10 September 2026. The tools are exactly what the server returned; nothing on this page is inferred from its name. Ranking in Neuronto search is never for sale.

Is this your server? Get a message the day it stops answering or its tools change: monitoring, 14 days free. Or claim the domain to manage how it is listed.