Index / MCP servers / Critical Path Partners

Critical Path Partners MCP server

Connect Critical Path Partners and your agent gets 13 tools, among them claim_workbench_evidence_ledger, collapsed_as_built, concurrent_delay_matrix. It answers at https://mcp.criticalpathpartners.ca/mcp over streamable HTTP, and it listed its tools to an anonymous client, so no sign-in was needed for that. Our probes reached it 7 of 7 times since 11 September 2026; the last check, on 9 November 2026, succeeded.

Status
Answering
Tools
13
Reliability
7 of 7 checks
Response time
398 ms
Transport
streamable HTTP
Last checked
9 November 2026

Forensic scheduling MCP for Primavera P6 (XER): AACE windows, DCMA-14, Monte Carlo, TIA.

Description as the publisher wrote it.

The 13 tools Critical Path Partners offers

ToolWhat it does
claim_workbench_evidence_ledgerForensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbench dashboard. Built from the real-world workflow where forensic delay analysis starts from a folder
Inputs: folder_path, evidence_files, output_dir, project_name, original_baseline_xer_filename, contract_form
collapsed_as_builtCollapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Base method (paired with MIP 3.3 Windows for the dual-method gap report per SCL §11.5). Validates a forensic windows a
Inputs: as_built_xer_path, delay_events, as_built_xer_content, output_dir, project_name, removal_method
concurrent_delay_matrixBuild the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window concurrency view per AACE RP 29R-03 §3.3.I (apportionment) and §4.2 (concurrency). Where ``forensic_w
Inputs: schedules, xer_paths, xer_contents
critical_path_validatorCritical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for false criticality, constraint-driven CP segments, open ends, broken logic, and surfaces a DCMA-14 bl
Inputs: xer_path, project_index, profile, baseline_xer_path, xer_content, baseline_xer_content
dcma14_health_checkFull Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Health Review skill, which produces a self-contained ~1.3 MB HTML dashboard. The dashboard renders DCMA
Inputs: current_xer_path, baseline_xer_path, current_xer_content, baseline_xer_content, output_path, timeout_seconds
forensic_windows_analysisRun forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and return the full analysis dict. This is the headline forensic tool — it computes per-
Inputs: schedules, project_name, baseline_idx, entitlement_milestone, output_dir
monte_carlo_p50_p80Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitative SRA (the same math as CPP's browser Tool_11 Portfolio Risk Engine, scripted Python counterpart)
Inputs: xer_path, iterations, distribution, optimistic_pct, most_likely_pct, pessimistic_pct
path_explorerLogic-trace driver-chain explorer — answers "WHY is this activity critical?" and "WHAT does it drive?". Traces driving predecessors backward from a target activity to project start (the "why critical" chain) and/or driving successors forwar
Inputs: xer_path, target_activity_codes, direction, include_near_critical, output_dir, xer_content
qramm_maturityQRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) on the five named maturity levels of AACE RP 122R-22 (Quantitative Risk Analysis Maturity Model), se
Inputs: sra_result
slip_velocityPer-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic windows analysis: - slip_velocity_days_per_day: completion shift / window duration (positive = slippin
Inputs: schedules, xer_paths, xer_contents
time_impact_analysis_fragnetTime Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (legacy): supply ``baseline_xer_path`` or ``baseline_xer_content``. All fragnets are inserted into the
Inputs: baseline_xer_path, fragnets, baseline_xer_content, per_event_bases, output_dir, project_name
woet_classifierWorked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairable activity (matched by ``task_code``), classifies execution into 4 day-states: - PROGRESS: work perfo
Inputs: baseline_xer_path, actual_xer_path, baseline_xer_content, actual_xer_content, today
xer_parserParse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For each table in the XER, returns the table name, field list, and record count. Per-row data is intentio
Inputs: xer_path, xer_content

Add Critical Path Partners to your AI client

Every block below points at https://mcp.criticalpathpartners.ca/mcp. Pick your client and copy.

Claude Code: one command in your terminal
claude mcp add --transport http critical-path-partners https://mcp.criticalpathpartners.ca/mcp
Claude Desktop: claude_desktop_config.json
{
  "mcpServers": {
    "critical-path-partners": {
      "command": "npx",
      "args": ["-y", "mcp-remote", "https://mcp.criticalpathpartners.ca/mcp"]
    }
  }
}
Cursor: ~/.cursor/mcp.json, or .cursor/mcp.json in a project
{
  "mcpServers": {
    "critical-path-partners": {
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
VS Code and GitHub Copilot: .vscode/mcp.json
{
  "servers": {
    "critical-path-partners": {
      "type": "http",
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Zed: Zed settings.json
{
  "context_servers": {
    "critical-path-partners": {
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Windsurf: ~/.codeium/mcp_config.json
{
  "mcpServers": {
    "critical-path-partners": {
      "serverUrl": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
JetBrains AI Assistant: Settings, Tools, AI Assistant, MCP, New MCP Server, as JSON
{
  "mcpServers": {
    "critical-path-partners": {
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Continue: .continue/mcpServers/neuronto.yaml
name: Critical Path Partners
version: 0.0.1
schema: v1
mcpServers:
  - name: Critical Path Partners
    type: streamable-http
    url: https://mcp.criticalpathpartners.ca/mcp
Gemini CLI: ~/.gemini/settings.json
{
  "mcpServers": {
    "critical-path-partners": {
      "httpUrl": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Codex CLI: MCP server config
{
  "mcpServers": {
    "critical-path-partners": {
      "type": "http",
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Warp: MCP servers, + Add, paste JSON
{
  "mcpServers": {
    "critical-path-partners": {
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}
Goose: a one-click extension link
goose://extension?url=https%3A%2F%2Fmcp.criticalpathpartners.ca%2Fmcp&type=streamable_http&id=critical-path-partners&name=Critical%20Path%20Partners

Is Critical Path Partners up right now?

It answered our last check on 9 November 2026 in 398 ms. Over 7 checks since 11 September 2026 it answered 7. Status here comes from Neuronto's own probes, not from the publisher.

MCP servers similar to Critical Path Partners

Questions about Critical Path Partners

How many tools does Critical Path Partners have?

13, as returned by the server's own tools/list on 13 September 2026: claim_workbench_evidence_ledger, collapsed_as_built, concurrent_delay_matrix, critical_path_validator, dcma14_health_check, forensic_windows_analysis, monte_carlo_p50_p80, path_explorer, and 5 more.

Is Critical Path Partners down?

It answered our last check on 9 November 2026 in 398 ms. Over 7 checks since 11 September 2026 it answered 7.

How do I add Critical Path Partners to Cursor?

Put the server under mcpServers in ~/.cursor/mcp.json with the URL https://mcp.criticalpathpartners.ca/mcp. The exact JSON is above, with the same setup for Claude Code, Claude Desktop, VS Code, Windsurf, Zed, Gemini CLI and the rest.

Does Critical Path Partners need an API key?

It listed its tools to an anonymous client, so reading the tool list needs no key. Individual tools can still ask for credentials in their own inputs.

Where this comes from

Publisher: io.github.danafitkowski. Endpoint host: mcp.criticalpathpartners.ca. ARD identifier: urn:air:io.github.danafitkowski:mcp:cpp-cpm-engine. First indexed 10 September 2026. The tools are exactly what the server returned; nothing on this page is inferred from its name. Ranking in Neuronto search is never for sale.

Is this your server? Get a message the day it stops answering or its tools change: monitoring, 14 days free. Or claim the domain to manage how it is listed.