Connect McpStamp Change Orders and your agent gets 11 tools, among them change_order_add_line, change_order_create, change_order_delete. It answers at https://mcp.zovo.one/mcp/change-order over streamable HTTP, and it listed its tools to an anonymous client, so no sign-in was needed for that. Our probes reached it 7 of 7 times since 11 September 2026; the last check, on 12 November 2026, succeeded.
Change orders against quotes and work orders: line changes, approval, running contract value.
Description as the publisher wrote it.
| Tool | What it does |
|---|---|
change_order_add_line | Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free. Inputs: change_order, kind, description, quantity, unit_price_minor, was_quantity |
change_order_create | Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open. Inputs: reference, reference_kind, client, title, date, currency |
change_order_delete | Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued. Inputs: change_order |
change_order_document | Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download li Inputs: change_order |
change_order_get | Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id. Inputs: change_order |
change_order_invoice_payload | Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro. Inputs: change_order, issue_date, tax_rate |
change_order_list | List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date. Inputs: reference, status, client, from, to, limit |
change_order_status | Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused. Inputs: change_order, status, date, note |
contract_value | The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused. Inputs: reference |
license_activate | Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it. Inputs: key |
license_status | Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes. |
Every block below points at https://mcp.zovo.one/mcp/change-order. Pick your client and copy.
claude mcp add --transport http mcpstamp-change-orders https://mcp.zovo.one/mcp/change-order
{
"mcpServers": {
"mcpstamp-change-orders": {
"command": "npx",
"args": ["-y", "mcp-remote", "https://mcp.zovo.one/mcp/change-order"]
}
}
}{
"mcpServers": {
"mcpstamp-change-orders": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"servers": {
"mcpstamp-change-orders": {
"type": "http",
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"context_servers": {
"mcpstamp-change-orders": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"mcpServers": {
"mcpstamp-change-orders": {
"serverUrl": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"mcpServers": {
"mcpstamp-change-orders": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}name: McpStamp Change Orders
version: 0.0.1
schema: v1
mcpServers:
- name: McpStamp Change Orders
type: streamable-http
url: https://mcp.zovo.one/mcp/change-order{
"mcpServers": {
"mcpstamp-change-orders": {
"httpUrl": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"mcpServers": {
"mcpstamp-change-orders": {
"type": "http",
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}{
"mcpServers": {
"mcpstamp-change-orders": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}goose://extension?url=https%3A%2F%2Fmcp.zovo.one%2Fmcp%2Fchange-order&type=streamable_http&id=mcpstamp-change-orders&name=McpStamp%20Change%20Orders
It answered our last check on 12 November 2026 in 77 ms. Over 7 checks since 11 September 2026 it answered 7. Status here comes from Neuronto's own probes, not from the publisher.
11, as returned by the server's own tools/list on 21 September 2026: change_order_add_line, change_order_create, change_order_delete, change_order_document, change_order_get, change_order_invoice_payload, change_order_list, change_order_status, and 3 more.
It answered our last check on 12 November 2026 in 77 ms. Over 7 checks since 11 September 2026 it answered 7.
Put the server under mcpServers in ~/.cursor/mcp.json with the URL https://mcp.zovo.one/mcp/change-order. The exact JSON is above, with the same setup for Claude Code, Claude Desktop, VS Code, Windsurf, Zed, Gemini CLI and the rest.
It listed its tools to an anonymous client, so reading the tool list needs no key. Individual tools can still ask for credentials in their own inputs.
Publisher: io.github.theluckystrike. Endpoint host: mcp.zovo.one. ARD identifier: urn:air:io.github.theluckystrike:mcp:change-order.
First indexed 10 September 2026. The tools are exactly what the server returned; nothing on this page
is inferred from its name. Ranking in Neuronto search is never for sale.