Index / MCP servers / Watt Street — US grid, interconnection queue and data center power

Watt Street — US grid, interconnection queue and data center power MCP server

Connect Watt Street — US grid, interconnection queue and data center power and your agent gets 7 tools, among them account_status, county_profile, interconnection_deadlines. It answers at https://api.wattstreet.net/mcp over streamable HTTP, and it listed its tools to an anonymous client, so no sign-in was needed for that. Our probes reached it 7 of 7 times since 12 September 2026; the last check, on 12 November 2026, succeeded.

Status
Answering
Tools
7
Official
yes, served from wattstreet.net
Reliability
7 of 7 checks
Response time
138 ms
Transport
streamable HTTP
Last checked
12 November 2026

How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.

Description as the publisher wrote it.

The 7 tools Watt Street — US grid, interconnection queue and data center power offers

ToolWhat it does
account_statusCredits remaining on the calling key, and how to top up without a human.
county_profileFull grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology.
Inputs: county, state
interconnection_deadlinesCluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it has been checked — a date marked unconfirmed came from a secondary source and h
Inputs: rto, upcoming_only
load_ledgerLarge-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most cannot be attributed to data centers or any other industry. Does not yet include
Inputs: state, min_mw, limit
map_dataGeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses.
Inputs: layer
policy_eventsTracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations.
Inputs: direction
search_projectsSearch 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome.
Inputs: region, state, status, fuel, min_mw, limit

Add Watt Street — US grid, interconnection queue and data center power to your AI client

Every block below points at https://api.wattstreet.net/mcp. Pick your client and copy.

Claude Code: one command in your terminal
claude mcp add --transport http watt-street-us-grid-interconnect https://api.wattstreet.net/mcp
Claude Desktop: claude_desktop_config.json
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "command": "npx",
      "args": ["-y", "mcp-remote", "https://api.wattstreet.net/mcp"]
    }
  }
}
Cursor: ~/.cursor/mcp.json, or .cursor/mcp.json in a project
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
VS Code and GitHub Copilot: .vscode/mcp.json
{
  "servers": {
    "watt-street-us-grid-interconnect": {
      "type": "http",
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
Zed: Zed settings.json
{
  "context_servers": {
    "watt-street-us-grid-interconnect": {
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
Windsurf: ~/.codeium/mcp_config.json
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "serverUrl": "https://api.wattstreet.net/mcp"
    }
  }
}
JetBrains AI Assistant: Settings, Tools, AI Assistant, MCP, New MCP Server, as JSON
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
Continue: .continue/mcpServers/neuronto.yaml
name: Watt Street — US grid, interconnection queue and data center power
version: 0.0.1
schema: v1
mcpServers:
  - name: Watt Street — US grid, interconnection queue and data center power
    type: streamable-http
    url: https://api.wattstreet.net/mcp
Gemini CLI: ~/.gemini/settings.json
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "httpUrl": "https://api.wattstreet.net/mcp"
    }
  }
}
Codex CLI: MCP server config
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "type": "http",
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
Warp: MCP servers, + Add, paste JSON
{
  "mcpServers": {
    "watt-street-us-grid-interconnect": {
      "url": "https://api.wattstreet.net/mcp"
    }
  }
}
Goose: a one-click extension link
goose://extension?url=https%3A%2F%2Fapi.wattstreet.net%2Fmcp&type=streamable_http&id=watt-street-us-grid-interconnect&name=Watt%20Street%20%E2%80%94%20US%20grid%2C%20interconnection%20queue%20and%20data%20center%20power

Is Watt Street — US grid, interconnection queue and data center power up right now?

It answered our last check on 12 November 2026 in 138 ms. Over 7 checks since 12 September 2026 it answered 7. Status here comes from Neuronto's own probes, not from the publisher.

MCP servers similar to Watt Street — US grid, interconnection queue and data center power

Questions about Watt Street — US grid, interconnection queue and data center power

Is there an official Watt Street — US grid, interconnection queue and data center power MCP server?

Yes. It is published by wattstreet.net and served from api.wattstreet.net, the vendor's own domain: https://api.wattstreet.net/mcp.

How many tools does Watt Street — US grid, interconnection queue and data center power have?

7, as returned by the server's own tools/list on 22 September 2026: account_status, county_profile, interconnection_deadlines, load_ledger, map_data, policy_events, search_projects.

Is Watt Street — US grid, interconnection queue and data center power down?

It answered our last check on 12 November 2026 in 138 ms. Over 7 checks since 12 September 2026 it answered 7.

How do I add Watt Street — US grid, interconnection queue and data center power to Cursor?

Put the server under mcpServers in ~/.cursor/mcp.json with the URL https://api.wattstreet.net/mcp. The exact JSON is above, with the same setup for Claude Code, Claude Desktop, VS Code, Windsurf, Zed, Gemini CLI and the rest.

Does Watt Street — US grid, interconnection queue and data center power need an API key?

It listed its tools to an anonymous client, so reading the tool list needs no key. Individual tools can still ask for credentials in their own inputs.

Where this comes from

Publisher: net.wattstreet. Endpoint host: api.wattstreet.net. ARD identifier: urn:air:net.wattstreet:mcp:grid. First indexed 10 September 2026. The tools are exactly what the server returned; nothing on this page is inferred from its name. Ranking in Neuronto search is never for sale.

Is this your server? Get a message the day it stops answering or its tools change: monitoring, 14 days free. Or claim the domain to manage how it is listed.