Connect Engineering and your agent gets 27 tools, among them assess_epbd_score, building_carbon_footprint, building_readiness. It answers at https://api.novtriq.tech/mcp over streamable HTTP, and it listed its tools to an anonymous client, so no sign-in was needed for that. Our probes reached it 6 of 6 times since 12 September 2026; the last check, on 24 October 2026, succeeded.
27 engineering compliance and calculation tools for the built environment (UK, EU, UAE).
Description as the publisher wrote it.
| Tool | What it does |
|---|---|
assess_epbd_score | Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures. Inputs: building_type, year_built, current_epc, heating_system, has_solar_pv, floor_area_m2 |
building_carbon_footprint | Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions. Inputs: building_type, floor_area_m2, location, year_built, elec_kwh_year, gas_kwh_year |
building_readiness | Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations. Inputs: current_use, proposed_use, year_built, structure, floors, condition |
calculate_carbon | Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback. Inputs: floor_area_m2, building_type, country, energy_kwh_year, construction_year |
calculate_pue | Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations. Inputs: it_load_kw, cooling_kw, ups_losses_kw, lighting_kw |
check_grid_feasibility_uae | Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps. Inputs: site_location, power_requirement_mw, voltage_level, intended_use, has_existing_supply, target_completion_year |
check_nis2_readiness | Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions. Inputs: has_ciso, has_ot_policy, has_board_reporting, has_asset_inventory, has_network_segmentation, has_ir_plan |
check_uae_bim_compliance | Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist. Inputs: building_area_m2, building_floors, emirate, building_type, has_bim_model, bim_software |
check_uae_cybersecurity | Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls. Inputs: organisation_type, emirate, has_isms, has_incident_response, has_vulnerability_assessment, has_third_party_audit |
contractor_vetting | NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligen Inputs: answers, purpose |
dgnb_bim_readiness | DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit. Inputs: answers, cert_target |
digital_renovation_passport | EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative. Inputs: floor_area_m2, current_epc, heating, country, address, building_type |
eed_datacentre_pack | EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mand Inputs: it_power_kw, total_energy_kwh, it_energy_kwh, water_input_m3, renewable_energy_kwh, reused_heat_kwh |
estimate_cooling_load | Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy. Inputs: space_type, floor_area_m2, it_load_kw, occupancy_persons, climate_zone, redundancy |
eu_cost_benchmarking | Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against cu Inputs: floor_area_m2, country, project_type, specification, procurement, programme |
eurocode_beam_designer | Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design. Inputs: material, config, span_m, udl_kn_m, point_load_kn, load_position |
eurocode_column_checker | Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design. Inputs: axial_load_kn, effective_length_m, material, section, buckling_curve, eccentricity_mm |
get_technical_dd_quote | Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA. Inputs: building_type, gross_area_m2, transaction_type, disciplines, geography, timeline_weeks |
heatpump_heatloss | Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP Inputs: floor_area_m2, storeys, age_band, location, external_design_temp_c, internal_design_temp_c |
mees_checker | England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory onl Inputs: property_type, current_epc_band |
part_o_overheating | UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM5 Inputs: location_risk, cross_ventilation, most_glazed_facade, floor_area_m2, glazing_area_m2, provided_free_area_m2 |
part_s_ev | UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power a Inputs: building_type, works, parking_spaces, dwellings, covered_car_park |
roi_calculator | Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict. Inputs: team_size, hourly_rate, manual_hours, software_cost, efficiency_gain_pct, implementation_time_months |
sap_sbem_precheck | UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full Inputs: sap_rating, annual_energy_kwh, floor_area_m2 |
thermal_load | Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison. Inputs: it_load_kw, ups_efficiency_pct, lighting_kw, room_area_m2, cooling_type, redundancy |
uae_climate_ghg | UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/conf Inputs: emirate, electricity_kwh, gas_kwh, gas_m3 |
uk_planning_checker | UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Articl Inputs: property_type, use_class, proposal, proposed_use, location, listed |
Every block below points at https://api.novtriq.tech/mcp. Pick your client and copy.
claude mcp add --transport http engineering https://api.novtriq.tech/mcp
{
"mcpServers": {
"engineering": {
"command": "npx",
"args": ["-y", "mcp-remote", "https://api.novtriq.tech/mcp"]
}
}
}{
"mcpServers": {
"engineering": {
"url": "https://api.novtriq.tech/mcp"
}
}
}{
"servers": {
"engineering": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}{
"context_servers": {
"engineering": {
"url": "https://api.novtriq.tech/mcp"
}
}
}{
"mcpServers": {
"engineering": {
"serverUrl": "https://api.novtriq.tech/mcp"
}
}
}{
"mcpServers": {
"engineering": {
"url": "https://api.novtriq.tech/mcp"
}
}
}name: Engineering
version: 0.0.1
schema: v1
mcpServers:
- name: Engineering
type: streamable-http
url: https://api.novtriq.tech/mcp{
"mcpServers": {
"engineering": {
"httpUrl": "https://api.novtriq.tech/mcp"
}
}
}{
"mcpServers": {
"engineering": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}{
"mcpServers": {
"engineering": {
"url": "https://api.novtriq.tech/mcp"
}
}
}goose://extension?url=https%3A%2F%2Fapi.novtriq.tech%2Fmcp&type=streamable_http&id=engineering&name=Engineering
It answered our last check on 24 October 2026 in 187 ms. Over 6 checks since 12 September 2026 it answered 6. Status here comes from Neuronto's own probes, not from the publisher.
Yes. It is published by novtriq.tech and served from api.novtriq.tech, the vendor's own domain: https://api.novtriq.tech/mcp.
27, as returned by the server's own tools/list on 23 September 2026: assess_epbd_score, building_carbon_footprint, building_readiness, calculate_carbon, calculate_pue, check_grid_feasibility_uae, check_nis2_readiness, check_uae_bim_compliance, and 19 more.
It answered our last check on 24 October 2026 in 187 ms. Over 6 checks since 12 September 2026 it answered 6.
Put the server under mcpServers in ~/.cursor/mcp.json with the URL https://api.novtriq.tech/mcp. The exact JSON is above, with the same setup for Claude Code, Claude Desktop, VS Code, Windsurf, Zed, Gemini CLI and the rest.
It listed its tools to an anonymous client, so reading the tool list needs no key. Individual tools can still ask for credentials in their own inputs.
Publisher: tech.novtriq. Endpoint host: api.novtriq.tech. ARD identifier: urn:air:tech.novtriq:mcp:engineering.
First indexed 10 September 2026. The tools are exactly what the server returned; nothing on this page
is inferred from its name. Ranking in Neuronto search is never for sale.